ABOUT       SERVICE       QUALITY      CAREER        CONTACT US    

QUALITY

RK Contract Private Limited

Quality Policy 

RK always work in Quality assurance to provide good service to customer, client of biggest project. we give service always when all specification and analysis done and checking well. our team firstly checking all Factor required in site. after that working begin..

project manager normally manages the budge on the job, and a construction manager , design Engineer   construction engineer or architect supervises it. Those involved with the design and execution must consider zoning requirements and legal issues, environmental impact of the project, schedulingbudgeting and biddingconstruction site safety, availability and transportation of building materials, logistics, and inconvenience to the public, including those caused by construction delays 



Objective RK of Quality in Construction

1. The quality in construction relates to the following objectives
2. Satisfaction of Contract Specifications
3. Completion of Project within Time
4. Enhancing Customer/ Owner Satisfaction
5. Motivation and Empowerment of Employees
6. Avoiding Disputes and Claims
7. Performance based on Purpose

Quality Assurance(QA) in Construction

Quality assurance are certain schemes that is implemented in construction in order to maintain the standard or the quality of the work in a consistent manner. Quality assurance forms the integral management system in a construction company. The companies generally will have a quality assurance chart that will specify various checks at different levels. In general, a quality assurance plan will involve the following:
Training Programs for Workers and Employees
Efficient Safety Programme
Effective Procurement system to obtain quality resources and suppliers
Reward scheme for innovative works
A competitive career progress scheme

Quality Control(QC) in Construction

Quality control in construction involves periodic inspection of the construction activities and facilities in order to meet the desired standardaisation as per the contract. Quality Control is undergone by the team of QC engineers or special trained teams. For example, the quality control for compaction work conducted for highway project is performed by measuring the soil density. Slump test helps in determining the workability of the concrete. Quality assurance forms a scheme for good management of construction activities while quality control undergoes inspection or sampling processes. Quality control focuses on:
Setting and Practicing specific standard for construction
Determining the deviations from the standards
Bringing and taking corrective measures to reduce variation
Standard Improvement with time

Quality of design

It refers to the quality with which the design is carried out. It primarily related to meeting the requirement of the standard, functionally efficient system and economical maintainable system.

Quality of conformance

 It is referred to the degree to which the constructed facility conformed the design and specification. Quality of conformance is affected by field construction methodology and Inspection

 Project Requirements

Quality of any construction project is meeting the respective project requirements. This will satisfy the designer’s requirements, the constructors & the owner’s requirements. 

Construction Organisation

Based on different studies considered it is concluded that the commitment and the leadership criteria of an construction organisation will affect the quality of the project. There is decline in construction productivity, if the management practices are poor.

Quality Teams

A structured environment is provided by having quality teams for the project. Practices are implemented structurally and continuously with regular quality checks. Quality teams will have structural engineers, environmental engineers, electrical, civil engineers, architects and owners to bring quality goals.

Participation of Team Members

The participation of the quality team members are not only important in the planning stage but also during the construction phase of the project.


PLAN
DO
ACT
CHECK

RK always follow Quality policy in progressive working zone and site field. our staff follow all rule and regulation RK contract. we manage all document of quality.